Date: 11/8/15
Time: 2:00 PM
Location: Furnas 1018
Attendees:
Today we needed to finish memo 3. Dwight and I had to finish the assembly of all the 3D component and then create engineering drawings for each individual part. I also took the initiative in writing up the embodiment design section. This included a function structure diagram, product architecture mapping diagram, and three configuration design diagrams. It was a late night, but in the end everything was finished and we were proud of our work. See our final memo 3 below.
Time: 2:00 PM
Location: Furnas 1018
Attendees:
- Dan Chelius
- Dwight Robinson
- Emilie Reynolds
- Paul Stathis
Today we needed to finish memo 3. Dwight and I had to finish the assembly of all the 3D component and then create engineering drawings for each individual part. I also took the initiative in writing up the embodiment design section. This included a function structure diagram, product architecture mapping diagram, and three configuration design diagrams. It was a late night, but in the end everything was finished and we were proud of our work. See our final memo 3 below.